Construction Requirements
1. base surface of wall and ground must be clean, solid, no oil and loose attachments
2. Substrate must be wet but no visible water.
3. Mix liquid and powder at weight ratio of 1:4, while starting slow agitator, puting powder into liquid slowly, stirring 2 to 3 minutes completely until without any particles.
4. Mixing mortar shall be run out within 30 minutes.
5. Second coating layer must be brushed after 12 hours when first coating layer is completed.
Attentions
1. Construction of base course can be carried out after waterproof layer dried and solid. Generally, it will costs 3 to 5 days.
2. Construction temperature are not allowed below 5℃.
3. Protect waterproof layer when there is strong sunlight or strong wind.
4. Tools and equipment should be cleaned with water immediately after application.
5. When completing coating construction 48 hours, appropriate water conservation can be carried out to waterproof layer in dry condition.
6. Construction should be stopped under sandstorm, rain, snow. Besides, visible water, sugaring and dusting on the substrate are not allowed.
Recommend Dosage
External wall, kitchen, bathroom and floor: 2kg/m²
Underground construction: 3-4kg/m²
Precautions
Some people are sensitive to resin product. Wear gloves and skin barrier cream when handling these products.
If contact with the resin occurs, it must be removed before it hardens with a resin removing cream such as Kerocleanse or Rozaklens skin cleanser, follow by washing soap and water. Do not use solvent.
Use of goggles is recommended. In case of accidental eye contact, wash thoroughly with plenty of clean water and seek medical advise immediately.
Ensure adequate ventilation when using resin and solvent containing materials.